Projects

Baltic market

International market

Reconstruction of Vilnius Kaunas overground gas transmission pipeline DN700 passing above the railway and continuing underground.

Vilnius-Kaunas AB Amber Grid

#
More on Youtube
Reconstruction of Vilnius Panevėžys Riga gas transmission pipeline DN700 in Pasvalys district municipality. 7 km of the total length of 14 km.

Vilnius-Panevėžys-Ryga AB Amber Grid

Reconstruction of Vilnius City district heating networks. A total of 1.9 km, DN50 DN250.

Vilnius Vilniaus šilumos tinklai

Gas regulation point and medium pressure gas pipeline to the cogeneration power plant Jočionių str. 13, design and construction work. DN315, 1.5 km.

Vilnius ESO

Medium pressure pipeline design services and installation work. DN20-160.

Prienai ESO

Gas pipeline planning and reconstruction works. DN32-160, 5.5 km.

Kretinga ESO

#
More on Youtube
Reconstruction of water supply networks Savanorių ave. 60, in construction work and planning.

Vilnius AB Vilniaus vandenys

Planning and installation works of 250 m3 underground tanks and technological pipelines for oil products. 16-21 bar, 5 underground tanks.

UAB Insola

Gas Interconnector Greece Bulgaria (ICBG). Automatic and manual welding of gas transmission pipeline DN800. 120 km of the total length of 182 km.

Greece-Bulgaria
Avax SA

Gas Interconnection Poland Lithuania (GIPL). Complete construction and testing of gas transmission pipeline DN700. 35 km of the total length of 165 km.

Lithuania-Poland
AB Amber Grid

Paldiski Kiili Balticconnector onshore pipeline in Estonia. Construction and testing of gas transmission pipeline DN700. 10 km of the total length of 55 km.

Estonia
EG Ehitus AS

Turnkey construction of a cathodic protection system for the Balticconnector pipeline. Installation of test, cathodic and drainage stations and galvanic anodes, testing measurements on the entire 55 km. pipe route.

Estonia
EG Ehitus AS

Turnkey construction of a cathodic protection system for the Gas Interconnection Poland Lithuania (GIPL) pipeline. Installation of test, cathodic stations and galvanic anodes, testing measurements on the entire 165 km. pipe route.

Lithuania-Poland
Amber Grid

#
More on Youtube