Gas, water and sewage

Home solutions

Get an offer in 24h

Answer few short questions to get as accurate proposal as possible

What kind of installation do you need?

Choose the offer that is relevant for you: installation of an outdoor gas pipeline, an indoor gas pipeline or a water supply / sewage system. You can choose one, several or all services.

Do you have a project?

Depending on whether you have a project or not, choose the right option. If you have a project, you will have to upload it in the next step. Otherwise, you will have to answer a couple of short questions.

What type of inlet do you prefer?

Pasirinkite, kokio įvado tipo pageidaujate. Jeigu jūsų statomo namo grindys jau išbetonuotos, požeminio įvado sumontuoti neįmanoma.

How does the cover of the plot look like?

Indicate whether the pavement of your plot is arranged (paved, concreted, etc.) or not. If the pavement has been already arranged, additional demolition and restoration works will be performed.

What is the radius of the plot?

a

Do you plan to install a gas stove?

Indicate whether you intend to install a gas stove. If you plan to do so, it will impact the length of the internal pipeline, the amount of materials and the working time.

What is the distance between gas pipeline inlet and gas devices inside the building?

Mark the distance from the box built by ESO to the house. The amount of materials used and the working time depend on the distance.

What is the radius of the window?

According to the rules of pipeline installation, there must be a window occupying at least 5% of the room in the place where the boiler is built. If your window is smaller, we will need to install a gas cut-off valve and alarm. The price of this package will additionally cost 450 EUR + VAT.

    Your contacts

    #
    Back

    Request successfully sent

    Back
    1/3
    2/3
    3/3
    a. Outdoor gas pipeline
    • Bringing the ESO distribution pipeline to the site boundary (box construction) – for this service, performed by an annual ESO contractor, you must apply directly to ESO. –  about 3 months
    • We will develop an outdoor gas pipeline project (if you don’t already have one). – 10 business days
    • We will install and deliver an outdoor gas pipeline. – 15-20 business days
    • We will submit documents to the ESO system. – 1 business day
    b. Indoor gas pipeline
    • We will develop an internal gas pipeline project (if you don’t already have one) – iki 10 business days
    • We will install an outdoor gas pipeline.- up to 10 – 15 business days
    • We will submit documents to the ESO system.- 1 business day

    DS-1 ensures

    Smooth workflow

    We will handle all gas and water supply tasks – from the first inspection to the submission of documents. All you have to do is enjoy a warm home.

    Experience in finding solutions

    More than 30 years of market experience enables us to easily determine the most efficient and practical solution, regardless of house type.

    Ongoing consultations

    We not only execute technical and administrative tasks, but also provide consultations on any and all issues related to pipeline installation.

    Our clients ask

    What documents do I need before ordering a gas pipeline project?

    If you are planning to design an outdoor gas pipeline, contact ESO for connection conditions, have an extract from the Center of Registers on land ownership and a topographic photograph. If you do not have it, we can order it. We will also need a plan of your plot to prepare the project.

    If you are preparing to build an internal pipeline, you will need the ESO connection conditions, an extract from the Center of Registers regarding the ownership or construction permit of the building, and a plan of the premises.

    In any case, we can help gather all the necessary documents.

    What documents do I need in order to install indoor gas pipeline?

    You will need chimney installation and inspection reports. They will be provided by the chimney installer (we can also order them). Provide bolt measurement protocols. They will be prepared by an electrician. If you have a gas stove, it will need protocols as well.

    We can take care of these documents as well. You will also need a boiler declaration of performance. It will be provided by the company from which you purchased the boiler. Do not forget to identify the boiler manufacturer and KW.

    What happens after the object is installed?

    We prepare the technical passport for the installation of the gas pipeline, hand over the object for maintenance, and send a report on the performed work. When we receive your signed work report, we send an invoice, and after receiving the payment, we submit the documents to the AB ESO system. The confirmation is sent to the customer, who is contacted by ESO and informed about the signing of the contract and the launch of the gas.

    Who prepares the contract for the use of gas, submits a certificate of limitations for the connection of the pipeline and arrives to start the gas and the meter?

    All this work is done by ESO, our work ends with the submission of documents to the ESO system.

    What is the AB ESO application number?

    This is the number of ESO connection conditions.

    When is a VERT certificate required?

    This certificate is required when the total power of the devices exceeds 100 kW and is issued within 7 business days.

    Turite kitų klausimų?

    Susisiekite

    Turite kitų klausimų?

    Susisiekite

    Get an offer in 24h

    What kind of installation do you need?

    Choose the offer that is relevant for you: installation of an outdoor gas pipeline, an indoor gas pipeline or a water supply / sewage system. You can choose one, several or all services.

    Do you have a project?

    Depending on whether you have a project or not, choose the right option. If you have a project, you will have to upload it in the next step. Otherwise, you will have to answer a couple of short questions.

    What type of inlet do you prefer?

    Pasirinkite, kokio įvado tipo pageidaujate. Jeigu jūsų statomo namo grindys jau išbetonuotos, požeminio įvado sumontuoti neįmanoma.

    How does the cover of the plot look like?

    Indicate whether the pavement of your plot is arranged (paved, concreted, etc.) or not. If the pavement has been already arranged, additional demolition and restoration works will be performed.

    What is the radius of the plot?

    a

    Do you plan to install a gas stove?

    Indicate whether you intend to install a gas stove. If you plan to do so, it will impact the length of the internal pipeline, the amount of materials and the working time.

    What is the distance between gas pipeline inlet and gas devices inside the building?

    Mark the distance from the box built by ESO to the house. The amount of materials used and the working time depend on the distance.

    What is the radius of the window?

    According to the rules of pipeline installation, there must be a window occupying at least 5% of the room in the place where the boiler is built. If your window is smaller, we will need to install a gas cut-off valve and alarm. The price of this package will additionally cost 450 EUR + VAT.

      Your contacts

      #
      Back

      Request successfully sent

      Back
      1/3
      2/3
      3/3